Consult your structural engineer first
Footing size is a calculation: column load divided by the safe bearing capacity of the soil. Two houses of the same size can need very different footings if one sits on firm soil and the other on filled ground or near a pond. Amroha and most of west UP are in seismic zone IV, which also affects how columns and footings are detailed. Treat every number on this page as a typical range, and confirm with your structural engineer before digging.
Typical isolated footing sizes on normal soil
These ranges assume normal firm soil with a safe bearing capacity of roughly 150 to 200 kN/m² (15 to 20 tonnes per m²), column spacing of about 3 to 4 m, and ordinary brick or block walls. Corner columns carry less load and usually get the smaller size. Middle columns carry the most and get the larger size.
| House | Footing size (L × B) | Footing thickness | Depth to bottom | Typical mesh |
|---|---|---|---|---|
| G (single storey) | 1.0 × 1.0 m to 1.2 × 1.2 m (about 3.5 to 4 ft) | 300 mm | 1.2 to 1.5 m | 10 mm or 12 mm at 150 to 200 mm |
| G+1 | 1.2 × 1.2 m to 1.8 × 1.8 m (about 4 to 6 ft) | 300 to 450 mm | 1.5 m | 12 mm at 150 mm |
| G+2 | 1.5 × 1.5 m to 2.1 × 2.1 m (about 5 to 7 ft) | 400 to 600 mm | 1.5 to 1.8 m | 12 mm at 125 mm or 16 mm at 150 to 200 mm |
Loose, filled, black cotton or waterlogged soil can need a bigger footing, a deeper footing, a combined or raft footing, or piles. Only a soil check and your engineer can tell.
Layers of a footing, bottom to top
- Excavation to the drawing depth, with the bottom levelled, rammed and free of loose soil and water.
- PCC bed: lean concrete 1:4:8 or 1:5:10, usually 75 to 100 mm thick, extending about 75 to 150 mm beyond the footing on all sides. It gives a clean, level base so the mesh does not sit on soil.
- Cover blocks of 50 mm on the PCC. IS 456 asks for a minimum 50 mm cover to steel in footings because the concrete is in contact with soil.
- Bottom mesh: bars in both directions, tied at every crossing, with the ends usually turned up as L bends.
- Column starter bars: placed on the mesh with an L bend at the bottom, held truly vertical with ties and the column stirrups started inside the footing.
- Footing concrete, usually M20 or as per drawing, either a flat slab or a sloped (trapezoidal) top.
Worked example: steel for one 1.5 m × 1.5 m footing
Try it: Steel calculator
Estimated steel: 4,000 kg (4.00 tonnes)
| Bar size | Approx kg | 12 m bars |
|---|---|---|
| 8 mm | 1,000 | 211 |
| 10 mm | 1,000 | 136 |
| 12 mm | 1,000 | 94 |
| 16 mm | 600 | 32 |
| 20 mm | 400 | 14 |
Assume a G+1 footing of 1.5 m × 1.5 m, mesh of 12 mm bars at 150 mm both ways, 50 mm cover, and a 150 mm upturned leg at each end of every bar. These numbers are for illustration only. Use your own drawing.
| Step | Working | Result |
|---|---|---|
| Length available for bars | 1500 − 2 × 50 cover | 1400 mm |
| Bars in one direction | 1400 ÷ 150 = 9.33, round up to 10 spaces, + 1 | 11 bars |
| Bars in both directions | 11 × 2 | 22 bars |
| Cut length of one bar | 1.40 m + 2 × 0.15 m legs | 1.70 m |
| Total length | 22 × 1.70 | 37.4 m |
| Weight per metre of 12 mm | 12² ÷ 162 | 0.889 kg |
| Weight of mesh | 37.4 × 0.889 | about 33 kg |
A house with 12 such footings needs about 400 kg of 12 mm bar for the meshes alone. Column starter bars and the column bars inside the footing are counted separately. Add 3 to 5 percent for cutting waste. Bend deductions are small here and are ignored for ordering.
Common footing mistakes
- Laying the mesh directly on soil or on broken brick pieces instead of proper 50 mm cover blocks.
- Skipping the PCC bed to save time. Soil mixes into the bottom concrete and the cover is lost.
- Column starter bars bent or out of plumb after casting, then heated and straightened. Never heat TMT bars.
- Using one footing size for every column when the drawing shows different sizes.
- Casting on a wet, muddy pit after rain without removing the slush.
- Not compacting the concrete with a vibrator, leaving honeycombs around the mesh.
What to order
Footings mostly use 10 mm, 12 mm and 16 mm bars, plus 8 mm for column ties, binding wire and 50 mm cover blocks. Send us the bar schedule from your drawing on WhatsApp and we will send current rates and a delivery plan. Rates change often, so we do not print them here.
Frequently asked questions
- What is the footing size for a G+1 house?
- On normal firm soil it commonly falls between 1.2 × 1.2 m and 1.8 × 1.8 m, with corner columns smaller and middle columns larger. Your engineer sizes each footing from the column load and the soil, so confirm with your structural engineer.
- How deep should a house footing be?
- Typically 1.2 to 1.8 m below ground for small houses, and always on firm natural soil, not filled earth. Deeper is needed if the top soil is loose.
- Why is cover 50 mm in footings when slabs use 15 to 20 mm?
- Footings sit in contact with soil and moisture. IS 456 asks for a minimum of 50 mm cover in footings to protect the steel from corrosion.
- Which bar size is used for footing mesh?
- Commonly 10 mm or 12 mm for single storey and G+1 houses, and 12 mm or 16 mm for G+2, at 125 to 200 mm spacing. Follow the drawing.