In this guide
What each one means
A PEB is designed by software and engineers for your exact size and load. The main frames are usually tapered I-sections built up from plates, deeper where bending is high and shallower where it is low. Purlins and wall girts are cold formed Z or C sections. Everything is cut, drilled and painted in a factory, then bolted together on site.
A conventional or fabricated shed is built from standard sections: MS angles, channels, pipes, RHS or I-beams. The roof is carried on trusses or pipe rafters, and most joints are welded on site or in the fabricator's yard. This is how most farm, shop and small factory sheds in west UP are made.
Side by side comparison
| Point | PEB | Fabricated truss or pipe shed |
|---|---|---|
| Typical clear span | About 15 m to 60 m and more without inner columns | Most often up to about 15 to 20 m |
| Design | Engineered for your size, wind and loads | Often by fabricator's experience; should be checked by an engineer |
| Steel weight | Usually lower for large spans, steel placed only where needed | Often heavier for large spans, lighter or similar for small ones |
| Speed on site | Fast bolted erection once parts arrive | Slower, more site welding and painting |
| Lead time | Design and factory slot can take several weeks | Can start quickly with stock material |
| Changes later | Extensions possible if planned, bolted parts | Easy to modify with welding |
| Best for | Large godowns, warehouses, factories | Small and medium sheds, farm and shop roofs |
These are broad patterns, not rules. A well designed fabricated shed can be economical at moderate spans, and a small PEB can be overkill for a 10 m wide farm shed.
When a local fabricated shed is enough
- Span is under about 15 to 20 m and you are fine with some inner columns if the building is wider.
- The building is small: a dairy shed, poultry shed, shop roof, a few hundred square metres of godown.
- You want to start quickly and your fabricator has a good record of similar sheds.
- You may modify the shed later: add a side bay, raise a portion, fit a crane hook (only with an engineer's check).
- Even here, get the frame designed by an engineer, especially columns, footings and bracing against wind.
When a PEB makes sense
- Clear span over about 20 m with no columns inside, for trucks, machines or stacking space.
- Large floor area where saving steel over the whole building adds up.
- Gantry crane, mezzanine floor or heavy roof equipment that needs proper design.
- Industrial or warehouse use where the bank, insurer or buyer expects design drawings and calculations.
- You want a fixed delivery and erection schedule from one supplier.
Foundations are different
PEB frames are often pinned at the base. They sit on anchor bolts cast into concrete pedestals, and the footings must take vertical load, wind uplift and horizontal thrust from the frame. The anchor bolt positions must match the PEB drawing within a few millimetres, so the foundation is cast from the supplier's anchor bolt plan.
Fabricated sheds often use pipe or I-section columns grouted into pockets in the footing, or base plates on anchor bolts. With lighter roofs, wind uplift can be larger than the roof's own weight, so the footing must hold the column down as well as up. In both cases, have the footing sized by an engineer based on soil and loads.
What to ask a PEB supplier
- Design wind speed and code used (IS 875 Part 3) and the live load on the roof.
- Main frame steel grade, purlin and girt thickness and coating, and roof sheet thickness and coating.
- Whether the price includes foundation bolts, erection, crane, transport, sheeting, ridge, gutter and turbo vents.
- Anchor bolt plan and reactions (loads at each column base) for your foundation engineer.
- Delivery time, erection time, and warranty on sheet paint and leakage.
- Drawings and design calculations handed over at the end.
Frequently asked questions
- Is PEB cheaper than a normal shed?
- For large clear spans and big areas a PEB often uses less steel and can work out cheaper overall. For small sheds a local fabricated shed is usually more economical. Compare complete quotes, including foundation and erection.
- What span can a fabricated truss shed cover?
- Fabricated truss sheds commonly cover up to about 15 to 20 m. Wider spans are possible with good design, but get the frame designed by an engineer.
- How long does a PEB take?
- Design approval and factory production usually take several weeks, then erection of a small building can be quick once the foundation is ready. Ask the supplier for a written schedule.
- Can I buy material for a fabricated shed from you?
- Yes. We supply MS pipes, hollow sections, angles, channels, I-beams, roofing sheets and fasteners. WhatsApp or call with your list for today's rate.